Preload control directly affects connection reliability. Torque, faying-surface treatment and tightening sequence all matter.

The faying surface must be clean, dry and free of oil, rust and coating; installation usually follows snug, re-tighten and final tightening steps.

After final tightening, mark the bolts and carry out sampling inspection to ensure the design preload is reached.